Title of Project Client Location Description Period Remarks
Supply of goods and related services for 138kV El Tortuguero-La Esperanza Transmission lines ENATREL Nicaragua ¤ýLot 1: 34km
¤ýLot 2: 7km
¤ýLot 3: 56km
2021.11 ~ Present EPC
$ 16.95 million
Consultancy Services for Extension of 220/400kV Nyakanazi Substation and Construction of New 400/132/33kV Kigoma (Kidahwe) Substation for Nyakanazi-Kigoma Transmission Line Project TANESCO Tanzania ¤ý400/132/33kV Kigoma S/S
¤ý 440/220kV Nyakanazi S/S
2021.04 ~ Present Consultancy Services
$ 0.8 million
Procurement of Plant Design, Supply, Installation, Test and Commissioning of Solar Mini - Grids Projects in 25 Towns/Villages into 6 Lots (Lot 4, 5) EEU Ethiopia ¤ýConstruction of Solar Power Generation Plant & Back up diesel generator 2021.02 ~ Present EPC
Lot 4: $ 3.9
Lot 5: $ 3.7
Consultancy Services for Southern Extension of the National Electricity Grid Power Transmission Project EEP Ethiopia ¤ý230/132kV T/L
¤ý230/132kV33kV S/S
2020.11 ~ Present Consultancy Services
$ 6.5 million
G0374/0375-AFG: North-South Power Transmission Enhancement Project DABS Afghanistan ¤ý500kV T/L, 239km
¤ý500/220kV S/S
2020.11 ~ Present Consultancy Services
$ 9.6 million
Consultancy Services for Construction Supervision for Electricity Distribution Network Rehabilitation & Upgrading for Six Towns EEU Ethiopia ¤ýRehabilitation and upgrade the existing MV&LV D/L 2019.05 ~ 2022.02 Consultancy Services
$ 1.6 million & ETB 26.3
Feasibility Study for 230kV Baluchaung-Taungoo Transmission Grid Construction Project K-EXIM Bank Myanmar ¤ý230kV T/L, 161km 2020.04 ~2021.12 F/S
$ 0.46 million
Supplying of Goods and Services relating Substation Villanueva and Transmission line of 138 kV El Sauce- Villanueva ENATREL Nicaragua ¤ý138kV S/S 2020.02 ~ 2021.12 EPC
$ 7.2 million
Supply of Goods and Services relating Substation Sebaco II and Transmission line of 138kV ENATREL Nicaragua ¤ý138kV S/S 2020.03 ~ 2021.11 Consultancy Services
$ 5.7 million
Consultancy Services for Feasibility Study for 220kV Interconnection Metoro-Palma EDM Mozambique ¤ý400kV/220kV T/L 2018.05 ~ 2021.10 Consultancy Services
$ 0.52 million
Construction of Tertiary System for Wastewater Treatment Plant (WWTP) of the city of Masaya ENACAL Nicaragua ¤ýTertiary (Power Supply) System 2020.05 ~ 2019.10 EPC
$ 2.6 million
Feasibility Study for Grid Reinforcement in Sihanoukville Project K-EXIM Bank Cambodia ¤ý230/115kV S/S
¤ý115kV T/L
2020.06 ~ 2021.08 F/S
$ 0.74 million
Rehabilitation of the Medium and Low Voltage Distribution Network - Lot A GPL Guyana ¤ý13.8kV MV network and LV secondary network 2017.01 ~ 2019.10 Consultancy Services
$ 2.2 million
Feasibility Study for Northern Ghana Rural Electricity Infrastructure and Access Project K-EXIM Bank Ghana ¤ý34.5kV/11.5kV Distribution S/S
¤ýDistribution Network System
2018.07 ~2019.04 F/S
$ 0.22 million
G0377-AFG Energy Sector Development Investment Program-Tranche 5 DABS Afghanistan ¤ý500/220kV S/S 2016.08 ~ 2019.02 Consultancy Services
$ 2.4 million
Feasibility Study for Construction Solar PV Power Plant with Energy Storage System K-EXIM Bank Sri Lanka ¤ý138kV T/L, 5.5km
¤ý30MW Solar PV & 45MWh ESS
2017.12 ~ 2018.12 F/S
$ 0.25 million
Feasibility Study, Preparation of Detailed Drawing, Design and Estimate of Underground Electric Distribution Network in DESCO Area DESCO Bangladesh ¤ý33/0.4kV Underground Distribution Network 2017.03 ~ 2018.12 F/S
$ 0.34 million
Consultancy Services for Project Supervision and Management of Sululta - Gebreguracha Power Transmission Project EEP Ethiopia ¤ý400kV/230kV T/L
¤ý400kV/230kV S/S
2020.05 ~ 2019.10 Consultancy Services
$ 3.7 million
Consultancy services for 400kV Somanga-Kinyerezi Transmission Line TANESCO Tanzania ¤ý400kV T/L, 198km 2017.02 ~ 2017.09 Consultancy Services
$ 3.4 million
Services for Supervision, Management and Engineering Projects funded by the Korea Exim bank ENATREL Nicaragua ¤ý138kV S/S
¤ý138kV T/L, 80km
2012.10 ~ 2017.07 Consultancy Services
$ 2.1 million
Feasibility Study for 400(220)kV Interconnection Namialo-Metoro under grant from Royal Norwegian Embassy EDM Mozambique ¤ý400/200kV S/S
¤ý400kV T/L, 218km
2015.09 ~ 2016.06 F/S
$ 0.4 million
Consultancy Services for Rural Electrification in Gaza Province Project under EDCF Loan from Korea Export-Import Bank (Loan No. Moz-3) EDM Mozambique ¤ý110kV T/L, 245km
¤ý110/33kV S/S
¤ý33/0.4kV D/L
2011.02 ~ 2016.05 Consultancy Services
$ 3.0 million
Consultancy services for New 132kV Kilimanjaro-Arusha Transmission Line & Rehabilitation of Kiyungi Substation Project TANESCO Tanzania ¤ý132kV T/L, 71km
¤ý132kV S/S
2010.11 ~ 2015.12 Consultancy Services
$ 2.0 million
Supply of goods and services related with Malpaisillo Substation phase 1 and the 138kV Transmission Line ENATREL Nicaragua ¤ý138kV S/S
¤ý138kV T/L, 80km
2010.11 ~ 2015.12 EPC
$ 16.5 million
Consultancy Services on GEPCO 132kV Substations for Rural Distribution Construction Project GEPCO Pakistan ¤ý132kV S/S 2008.12 ~ 2014.07 Consultancy Services
$ 1.6 million
 
 
16F, 18F, Pan-Pacific B/D, 12, Digital-ro 31-Gil, Guro-gu, Seoul, Korea (08380)
Tel: (Energy Business Division) +82-2-767-4019, (Power IT Division) +82-2-767-6739
Fax: (Energy Business Division) +82-2-761-1077, (Power IT Division) +82-2-3454-0903
COPYRIGHT(C) 2015 BYUCKSAN ENGINEERING GROUPALL RIGHT RESERVED.