Construction of High efficiency energy equipment for High voltage pump and fan of Main boiler in Power plant Project
|
Daegu Dyeing Industrial Center
|
Korea |
¤ýEquipment: Fluid Coupling
¤ýRelated works
|
Aug. 2006
Sep. 2007
|
Construction of High efficiency energy equipment for Main boiler system in Beer Factory Project |
Kolon Global |
Korea |
¤ýEquipment: Heat Pump
¤ýRelated works
|
Aug. 2007
Oct. 2007
|
Construction of Waste heat recovery system between Youngheung Environment and Hansol Paper Project |
Youngheung Environment
|
Korea |
¤ýLength(Pipe line): 30km
¤ýOthers
- Supplying the energy used to heat
recovery from the incinerator facility.
|
Aug. 2010
Jan. 2013
|
Construction of High efficiency energy equipment for Main boiler Feed water pump in Power plant Project |
Daegu Dyeing Industrial Center |
Korea |
¤ýEquipment: Fluid Coupling
¤ýRelated works |
Jan. 2012
Oct. 2012
|
Construction of Waste heat recovery system between Resource Center and Youll Energy Project |
YouIl Energy |
Korea |
¤ýLength(Pipe line): 22km
¤ýOthers
- Supplying the energy used to heat
recovery from the incinerator facility.
|
Oct. 2012
Oct. 2013
|
Construction of HTC(High Temperature Condensation Utilization) System for Increase energy efficiency of Kim-Hae district office Project |
KDHC
(Korea District Heating Corporation)
|
Pakistan |
¤ýOthers
- Reused to recover the waste heat
discharged from the power plant
- 10 years operating
|
Jan. 2013
Jun. 2014 |
Construction of Steam Pipe line for Waste heat recovery from the incinerator between AT Energy and I-Gun energy Project |
AT Energy |
Korea |
¤ýLength(Pipe line): 30km
¤ýOthers
- Supplying the energy used to heat
recovery from the incinerator facility. |
Dec. 2014
Apr. 2015
(Ongoing)
Jan. 2014 |