Construction of 2,995.2kW Solar Power Plant for Najeon-Solar |
Najeon Solar Corporation |
Korea |
¤ýCapacity: 2,995.2kW
¤ýStand-alone PV system(Off-Grid) |
Nov. 2016
Apr. 2017 |
EPC
$ 2.95 Millions |
Supervision Services of Design and Responsible Construction for Construction of Daewoo Pocheon Natural Gas Power Plant Unit 1 |
Pocheon IPP Corporation |
Korea |
¤ýCapacity: 947MW
¤ýGas Turbin 633.2MW
¤ýSteam Turbin 313.8MW
¤ý345kV Transmission 2.4km |
Aug. 2014
Jun. 2017 |
Supervision(Power Plant)
$ 1.12 Millions |
Consultancy services for Power supply system (Phase 3) of InCheon International Airport Project |
IIA(Incheon International Airport Corporation) |
Korea |
¤ý765kV Two-wire Tower
¤ýLine: 33.649km |
May. 2014
Oct. 2017 |
Supervision(Airport)
$ 3.39 Millions |
Gwanggyo River Treatment Plant and collection works |
KEXIM(Export?Import Bank of Korea) |
Korea |
¡¤ Pumping structure construction 15m
¡¤ Installation of water pipeline, cleaning valves air and electromechanical component
¡¤ Design and construction of electrical grid in 24kV. |
Mar. 2013
Sep. 2015 |
Construction
$ 16.13 Millions |
Responsible Supervision for Ansan Combined Cycle Power Plant Construction Project |
S-Power |
Korea |
¤ýGas Turbin: 275.6MW*2
¤ýSteam Turbine: 283.1MW |
Jun. 2012
Jan. 2015 |
Supervision
$ 2.86 Millions |
Owner's Engineering Consultancy Service Contract for Indonesia ISM Power Plants(No. 1 & 2) Construction |
PT.Krakatau POSCO Energy |
Indonesia |
¤ýCapacity: 200MW
¤ýBoiler: 360t/hr*2units
¤ýStack: 125m |
Nov. 2011
May. 2013 |
Supervision(ISM Power Plant)
1.5 Millions |
Sewage Water Collection Construction works of tanks, Sewage Water Treatment Plant and Rehabilitation Plant of Drainage Pipe of Hangang River |
Korea Environment Corporation |
Korea |
¡¤ Wastewater pipeline 80.1km,
¡¤ Drainage system 1,760 homes 65 pumps.
¡¤ Installation of pumping equipment 150
¡¤ Pumping construction works 17m
¡¤ Dewatering pipeline |
Dec. 2011
Jun. 2015 |
Construction
$ 3.39 Millions |
Myanmar SHWE Gas Field Development site Construction work for Electrical and Instrument |
Hyundai Heavy Industries |
Myanmar |
¤ýConstruction, Field Engineering
¤ýTest & Commissioning |
Jun. 2011
Jun. 2013 |
EPC
$ 5.63 Millions |
The Supply of MPDP Display System For Building (B) in Nay Pyi Taw, Myanmar |
INPT Development Committee |
Myanmar |
¤ýMPDP Display System(Material and Accessories)
¤ýMPDP Display System(Installation and Services) |
Mar. 2010
Dec. 2010 |
EPC
$ 0.84 Millions |
Potable Water Collection Construction works of tanks, potable water treatment plant and wastewater treatment plant HUPO plant, Jukbyeon |
Korea Environment Corporation |
Korea |
¡¤ Design flow rates.
¡¤ Construction
¡¤ Medium voltage electrical design, machinery, electricity and instrumentation
¡¤ Pumping structure construction 15m
¡¤ Duct
¡¤ Installation of pumping equipment |
Jul. 2009
Mar. 2012 |
Construction
$ 10.58 Millions |
Consultancy services for Construction of 345kV Incoming Power system in POSCO Project |
POSCO(Pohang Steel Corporation) |
Korea |
¤ýLevel Upgrade (154kV¡æ345kV)
¤ý154kV GIS & CLR, MCS(22kV, 3.3kV, 0.4kV) |
Oct. 2005
Feb. 2008 |
Supervision(T/L, S/S)
$ 1.09 Millions |