LOCATION : HOME > Business > Other Power Project
Title of Project Client Location Description Period Remarks
Construction of 2,995.2kW Solar Power Plant for Najeon-Solar Najeon Solar Corporation Korea ¤ýCapacity: 2,995.2kW
¤ýStand-alone PV system(Off-Grid)
Nov. 2016
Apr. 2017
EPC
$ 2.95 Millions
Supervision Services of Design and Responsible Construction for Construction of Daewoo Pocheon Natural Gas Power Plant Unit 1 Pocheon IPP Corporation Korea ¤ýCapacity: 947MW
¤ýGas Turbin 633.2MW
¤ýSteam Turbin 313.8MW
¤ý345kV Transmission 2.4km
Aug. 2014
Jun. 2017
Supervision(Power Plant)
$ 1.12 Millions
Consultancy services for Power supply system (Phase 3) of InCheon International Airport Project IIA(Incheon International Airport Corporation) Korea ¤ý765kV Two-wire Tower
¤ýLine: 33.649km
May. 2014
Oct. 2017
Supervision(Airport)
$ 3.39 Millions
Gwanggyo River Treatment Plant and collection works KEXIM(Export?Import Bank of Korea) Korea ¡¤ Pumping structure construction 15m
¡¤ Installation of water pipeline, cleaning valves air and electromechanical component
¡¤ Design and construction of electrical grid in 24kV.
Mar. 2013
Sep. 2015
Construction
$ 16.13 Millions
Responsible Supervision for Ansan Combined Cycle Power Plant Construction Project S-Power Korea ¤ýGas Turbin: 275.6MW*2
¤ýSteam Turbine: 283.1MW
Jun. 2012
Jan. 2015
Supervision
$ 2.86 Millions
Owner's Engineering Consultancy Service Contract for Indonesia ISM Power Plants(No. 1 & 2) Construction PT.Krakatau POSCO Energy Indonesia ¤ýCapacity: 200MW
¤ýBoiler: 360t/hr*2units
¤ýStack: 125m
Nov. 2011
May. 2013
Supervision(ISM Power Plant)
1.5 Millions
Sewage Water Collection Construction works of tanks, Sewage Water Treatment Plant and Rehabilitation Plant of Drainage Pipe of Hangang River Korea Environment Corporation Korea ¡¤ Wastewater pipeline 80.1km,
¡¤ Drainage system 1,760 homes 65 pumps.
¡¤ Installation of pumping equipment 150
¡¤ Pumping construction works 17m
¡¤ Dewatering pipeline
Dec. 2011
Jun. 2015
Construction
$ 3.39 Millions
Myanmar SHWE Gas Field Development site Construction work for Electrical and Instrument Hyundai Heavy Industries Myanmar ¤ýConstruction, Field Engineering
¤ýTest & Commissioning
Jun. 2011
Jun. 2013
EPC
$ 5.63 Millions
The Supply of MPDP Display System For Building (B) in Nay Pyi Taw, Myanmar INPT Development Committee Myanmar ¤ýMPDP Display System(Material and Accessories)
¤ýMPDP Display System(Installation and Services)
Mar. 2010
Dec. 2010
EPC
$ 0.84 Millions
Potable Water Collection Construction works of tanks, potable water treatment plant and wastewater treatment plant HUPO plant, Jukbyeon Korea Environment Corporation Korea ¡¤ Design flow rates.
¡¤ Construction
¡¤ Medium voltage electrical design, machinery, electricity and instrumentation
¡¤ Pumping structure construction 15m
¡¤ Duct
¡¤ Installation of pumping equipment
Jul. 2009
Mar. 2012
Construction
$ 10.58 Millions
Consultancy services for Construction of 345kV Incoming Power system in POSCO Project POSCO(Pohang Steel Corporation) Korea ¤ýLevel Upgrade (154kV¡æ345kV)
¤ý154kV GIS & CLR, MCS(22kV, 3.3kV, 0.4kV)
Oct. 2005
Feb. 2008
Supervision(T/L, S/S)
$ 1.09 Millions
 
 
16F, 18F, Pan-Pacific B/D, 12, Digital-ro 31-Gil, Guro-gu, Seoul, Korea (08380)
Tel: (Energy Business Division) +82-2-767-4019, (Power IT Division) +82-2-767-6739
Fax: (Energy Business Division) +82-2-761-1077, (Power IT Division) +82-2-3454-0903
COPYRIGHT(C) 2015 BYUCKSAN ENGINEERING GROUPALL RIGHT RESERVED.